Digital Twin #102
Time-Series Plume Replay · 09:45 WIB (T-05m · Plume Drift Across Central Manifold)
SE coastal wind (4.8 m/s) pushes vapor plume (38.0% LEL) and smoke across Route C (East Shortcut). Route A remains safe and recommended.
Multi-Hazard Telemetry Envelope
4.8 m/s SE (135 deg)Primary gasoline storage tank. Adjacent to north vapor sensor array.
Central north tank near manifold valve cluster. Primary hazard origin in leak/fire scenarios.
East storage tank storing automotive diesel fuel.
Northeast storage tank with dedicated foam deluge ring.
Main transfer pipeline corridor connecting Tank Farm North to Gantry Loading Bays.
High-activity road tanker loading area. Origin point for primary worker evacuation groups.
Secondary tanker bay downwind of Central Pipe Manifold.
High-voltage compressor and hydrocarbon vapor recovery skid. Restricted access during alert.
Main operations center housing Digital Twin servers, UPS backup, and emergency dispatch.
Upwind emergency perimeter exit with battery-backed dynamic LED signage.
South-east perimeter exit bypassing the north storage tank bund wall.
Primary upwind assembly point equipped with headcount RFID reader and dynamic status board.
Secondary assembly point along the south perimeter service road.
East perimeter assembly zone; subject to downwind plume exposure during SE wind shifts.